BLUESKY, a manufacturer of DC electric truck charging stations, not only provides equipment but also customized solutions like local payment. And for regions like Jordan, where all kinds of charging standards,s including CCS1, CCS2, GB/T, CHAdeMO, and NACS, we develop a charging station with 4 DC charging connectors, which can charge most electric cars.
- Heavy-duty truck high-power super fast charging
- One device with multiple charging guns saves costs
- Intelligent allocation of charging power
E-Truck Charging with 4 DC Charging Connectors
The customer will require a charger with all charging connectors in case of incompatibility with some electric cars, like Jordan, which requires all charging standards. Colombia requires GB/T. CCS1 and CCS2. Georgia requires GB/T, CCS2, and NACS.
CDZ-YC DC Electric Truck Charging with 4 DC charging connectors supports dynamic/flexible power allocation due to BMS, thus bringing the best out of the charger–highly efficient, shorter queuing time.
With a cable management system, so as to prolong cable lifetime and be convenient for drivers to hold.
With a double 22-inch advertising player, it can be an additional revenue source to be rented out to play commercial ads.
Charging ranges from 360kW to 600kW.
With a liquid cooling method.
Which can support all types of EVs like electric buses, vans, and E-trucks, without concern for heat dissipation and fast charging.
Professional and Efficient Liquid-Cooled Electric Truck Charging Manufacturer
Trusted EV Supercharger station equipment
E-Truck Charging main technical specification
- Type: DC charging station
- Dimension: 0.75*1.615*2.12m (w*d*h)
- Installation: On the ground
- Material: Sheet metal
- Weight: 1500kg

Charging system
- Connectors: 4
- Power Distribution: 4 connectors, intelligent distribution based on 40kW when 600kW
- Flexible Power Distribution Algorithm
- Trigger Conditions
When multiple charging guns are used simultaneously, and the total demand power exceeds the available system power, power allocation is activated.
Bluesky DC EVcharging power allocation calculation formula:
- System has 6 modules, each 20kW → 120kW total
Two cars demand: 100kW and 80kW
Total demand = 180kW > 120kW → allocation triggered - Calculate Demand Ratio
Car A: 100 ÷ 180 = 0.556
Car B: 80 ÷ 180 = 0.444 - Allocate Modules Proportionally
Total modules = 6
An initial calculation: 6 × 0.556 = 3.33
B initial calculation: 6 × 0.444 = 2.67 - Rounding & Adjustment
A allocated: 3 modules
B allocated: 3 modules
Total = 6, no further adjustment needed.
- If there is excess or shortage:
Add modules starting from the car with the higher demand ratio, or reduce modules starting from the car with the higher demand ratio
- Fairness & Minimum Guarantee
- Each car is guaranteed at least 1 module (to prevent “starvation”)
If ratios are equal, the car with the smaller gun number has priority
There’s bound to be a color you’ll love.



How to install a CDZ-YC EV Charging?
More details:
How does Bluesky produce qualified Electric Truck Charging?









BlueSky Electric Vehicle Chargers are Used in Over 20 Countries Worldwide
- Production process
- Test equipment
- Production equipment
FAQ
1 . What is the meaning of “flexible power allocation/distribution”?
Normally, a 120kW DC fast charging station can output 120kW at most, and when 2 cars come to charge, then each is 60kW and 60kW. But sometimes car 1 only needs 30kW and car 2 needs 90kW, then the DC charger station cannot bring out the best of itself. Flexible power allocation is the solution to borrow the idle 30kW charging module from car 1 to car 2 to achieve more efficient charging.
2. Do I need a CDZ-YC DC Electric Truck Charging with 4 different DC charging connectors?
No. You need to do the market research to find the market share of each charging standard. Like in Jordan, although there are 5 different charging standards, there are more GB/T charging standards. So, 2 GB/T charging connectors are needed to reduce idling. For the rest of the charging connectors, you can build another charger station nearby or just use an adaptor.
3. How about cooling inside the charger?
It use liquid cooling charging connector, and there is a pump and tank inside. Usually, a replacement of coolant onceevery half a year is needed.
4. Can I monitor the charging data?
Yes, you can develop your own charging system based on OCPP1.6J to control the BLUESKY DC fast charging station. Or you can use the BLUESKY system, which already integrates Google Pay and Apple Pay.
5. How to achieve profitability as early as possible?
Choose a suitable power and charging connector for the charger station you are gonna use. Know clearly the power loss of the DC fast charger. Plan well when installing a charging station to avoid power loss in the transformer and cable. Choose a good location where many electric cars come and stop. Suitable discount when first operating. Regular maintenance to ensure the best charging performance. Monitor charging data and analyze to adjust price policy.