Are you considering operating a public EV charging station for commercial use to generate profits? Here is the guide on what you want to know about public EV charging stations.
What are Public EV chargers?
Compared with personal use, public EV charging stations should allow different drivers to charge and pay for them. Besides, a charging point operator should be able to have the charging data to analyze factors influencing the turnover, like price, time, output power, and so on.
How to pay?
Bluesky offers 2 methods. One is RFID card payment, which applies to a situation similar to a gas station, where employees are on site and they can issue you an RFID card with a certain amount of money for charging. How do drivers pay for the RFID card? Cash, mobile POS, etc. Use your independent way of payment. The other one is App and POS. As for the app, Bluesky needs to get your local online payment API to do the integration. Regarding POS, now PAX and Nayax are available. The second is a 7/24 unattended public EV charging station operation model. But the software integration and the POS device will bring extra cost.

Where to get the charging data
Bluesky offers a charging cloud management system for CPOs to better operate public EV charging stations.

The preparation before investing in a Public EV charging station
- Power availability: Check the electricity, and if a DC charger, you also need a transformer.
- The selection of installation place: choose one with higher traffic and more amenities around, so the driver can have a better charging experience.
- Permission: Check your local regulations about the license.
How to choose a suitable EV charger?
Output kW of a public EV charging station
It depends on your demand for charging speed.
Charging time(hours)≈Battery capacity ÷ Output kW of charger
But for AC, the kW of the on-board charger (OBC) will limit the output kW of the charger.
For DC, the battery decides the max output kW it can accept.
- If you wanna build on the underground of the departments where drivers can park their EVs, for the whole night. 7kW, 11kW, 22kW is enough.
- If you wanna build near a shopping mall, restaurant, etc., a DC charger ranging from 60kW to 120kW is ok.
- If your projects are for electric buses, vans with higher demand on charging speed, a DC charger from 180kW to 400kW is worth considering.
Type of charging connector
EV is different from an oil car. EVs have different charging ports, so there should be a corresponding EV charging station.

- CCS1 for American and Korean EVs.
- CCS2 for European EVs.
- GB/T for Chinese EVs.
- CHAdeMO for Japanese EVs.
- NACS for Tesla Only.
But the origin of the brand of EV does not 100% decide its charging port. For example, there are many BYD in Brazil. But they are CCS 2.
Bluesky supports a public EV charging station
- OEM charger to build your Brand
- App and charging management system
- Payment integration, if needed