How to troubleshoot BRM reception timeout on the charging pile?

Find fault clues in the communication logs. When the DC charging pile starts, “BRM reception timeout” occasionally occurs. It causes charging to stop.

Immersion Liquid Cool EV Charger 4

Effective troubleshooting should focus on whether communication is established.

BRM refers to the BMS and vehicle identification message. It is used to provide identification information to the charger.

Before troubleshooting, confirm the protocol version adopted by the vehicle and the pile. Check the interaction process and timeout conditions according to the corresponding requirements. Avoid mixing rules of different versions. First, keep the process intact, then analyze the alarm. Only intercept errors; timeouts often cannot find a reason. It is recommended to keep continuous records from gun insertion, auxiliary power establishment, to startup failure. Integrate device logs with external sources. Align the CAN collection time of the department.

Charging station charging scenarios

Key observations: Before the timeout, were there any communications between both parties? Whether the vehicle starts to send identification information. Whether communication interruption or re-handshake occurs midway. Distinguish no transmission, incomplete transmission, and unrecognized status. If relevant interactions cannot be seen at all times in external collection records. Check collection conditions first, then troubleshoot vehicle wake-up. Auxiliary power supply and communication connection. If transmission has started but not completed. Check whether packet loss exists in the multi-packet transmission process. Duplication, abnormal sequence number, or response interruption. Seeing several frames of relevant data does not mean the complete BRM has been received successfully. If external records show complete transmission. While the device still reports a timeout, further check the device receiving records.

Message validity and current situation: Communication phase.

Normal external procurement: Check the stability of wiring and power supply. For intermittent faults, pay attention to connector contacts. Check harness status, terminal matching, auxiliary power fluctuation, and on-site interference.

Also observe whether a power drop or communication abnormality appears at the startup moment. For live measurement, qualified personnel shall use proper instruments.

Applications of LVGL in Charging Pile

Narrow the scope by cross-testing. Replace charging equipment for the same vehicle; connect different vehicles to the same device. Keep test conditions as consistent as possible. Record performance after first startup, repeated startup, and re-inserting the gun. Change only one condition each round to avoid unexplainable test results. Verify repeated startup and abnormal recovery after repair. One successful charge cannot prove the problem is solved. Cover continuous startup, retries after communication interruption, and different vehicle combinations.