How to understand the charging speeds?

Look at two transactions on the same charger station on Bluesky WOW charger boss (App For CPO to monitor charging data), you may wonder why the first charging deal lasted nearly twice the time of the second deal, but the charging amount is half? Well, the fee is based on the output power rather than charging time. You may be curious about the factors influencing the charging speed.

You may be curious about the factors influencing the charging speed

Charging speeds of charging piles with different powers are different

1. Why are the charging speeds limited by the vehicle?

1)Battery management system (BMS) decides on the max output power and charging speed

The output power of the charger station is only the maximum power it can output. The real charging power and charging speed are controlled by the EV’s BMS. The reasons are below:

  • For safety: Too high power can lead to the overheating of the battery, and it will affect the battery’s lifetime and may pose a risk.
  • The chemical feature of the battery: Different batteries(NCM and LFP)have different charging characteristics. NCM is supposed to be fast charging, but not as stable as LFP.

For example:

An old version of EV can only support a max of 50kW. Even if it is connected to a 240kW charger, the power will not surpass 50kW.

Installing a canopy on a charging pile

2)The output power varies with state of charge(SOC), so the charging speed varies

Nearly all EVs comply with the charging rule of fast at first and then slow:

  • 0~20%  Allows max output power charging (Tesla reaches charging peak at 10% SOC).
  • 20~80%  The power gradually slows down in case of overheating of the battery.
  • 80~100%  Power is greatly reduced (“trickle charging”) to preserve battery life.

2. The popular EV charging speed performance

Brand Battery (kWh) Peak power (kW) Average Power(10–80%) 10–80% time
BYD seagull 30.1 ≈40 ≈36 ≈30 min
Tesla Model 3 LR 82 ≈249 ≈95 ≈34 min
MG MG4 51 88 ≈59 ≈36 min
VW ID.4 Pro 82 ≈127 ≈91 ≈28 min
Polestar 3 111 ≈125 ≈137 ≈33 min
Lucid Air GT 119 ≈250–300 ≈171 ≈29 min
Lucid Air Dream 118 ≈302 ≈147 ≈33 min

Charging is not only with a charger station, but EV itself. Even if BYD and Huawei launch megawatt charging, will it be 1000kW charging when you charge the BYD seagull? Of course not.

3. Pay for charging based on charging speed?

As the high-power charging develops, even MW charging, EVs do not change so quickly. Most are still driving 400V EVs, and they cannot reach high-power charging. Here comes the question: Is it fairer to pay for charging based on charging speed?

For example:

50kW 0.25 Euro/kW

150KW 0.3 Euro/kW

But there may be other opinions: Like in Japan, they pay based on charging time. When you have higher power charging, which means you occupy the charger for a shorter time, and it can have time to serve other EVs.