MCS is crucial to the electric commercial vehicle industry

Why is MCS crucial to electric commercial vehicles? There are two core pain points for electric commercial vehicles (or should we say, the pain points of all electric vehicles now):

  • Range anxiety: drivers worry that the vehicle will run out of power during operation.
  • Charging time: Traditional charging methods take too long, affecting operational efficiency.

MCS is designed to solve this problem. It provides ultra-fast charging in minutes. What does this mean? It means that the vehicle can complete most of the energy replenishment during the mandatory rest time, greatly reducing the non-operating time.

Application scenarios of MCS

There are three main requirements for MCS in public charging scenarios:

  • Accessibility: Ensure that the charging process does not affect the passage of other vehicles.
  • Infrastructure adaptation: The design of charging stations must consider the spatial layout, power supply capacity, and heat dissipation requirements of MCS.
  • Complete national and regional standards.

Although MCS charging still relies on manual operation, automation is an irreversible trend. What we are looking forward to is the future port or logistics park, where electric trucks automatically drive to the designated location, the robotic arm accurately docks, completes charging, and then automatically leaves. This scenario is gradually becoming a reality or has already become a reality in part. The design of MCS considered this from the beginning, and reserved interfaces and possibilities for realizing automated connection. This is not only an improvement in efficiency, but also a guarantee of safety.

MCS uses Ethernet communication

At present, the communication protocols used for high-power charging of electric vehicles in various countries or regions are different, and each has its advantages and disadvantages.

Europe and the United States mainly use ISO15118 PLC, China and Japan use CAN communication, and Tesla also mainly uses CAN communication (different regions vary).

Although the “single-ended” PLC used by CCS does not require special connection pins to realize communication between EV and EVSE, it also has the disadvantages of being susceptible to EMC interference and not suitable for ultra-high power.

Compared with CCS, the current of MCS has increased by 6 times, and the power has increased by 10 times. This means that electromagnetic interference EMI will increase sharply. The reliability of a traditional single-ended PLC will be greatly reduced in such a high-noise environment. Therefore, MCS recommends the use of Ethernet, especially 10Base-T1S (IEEE802.3). It naturally supports the TCP/IP protocol stack, and its anti-interference ability far exceeds that of PLC, which can ensure stable and reliable communication under high power.

PLCA message structure
PLCA message structure

The figure below intuitively shows the performance difference between PLCA and traditional PLC. The figure on the left shows that when the number of nodes increases, the throughput of PLCA remains almost stable, while that of PLC decreases significantly. The figure on the right shows that under high load conditions, the maximum access delay of PLCA is much lower than that of PLC.

Comparison of PLCA and PLC in throughput and access delay
Comparison of PLCA and PLC in throughput and access delay

What does this mean? In a complex charging environment, such as multiple devices communicating at the same time, PLCA can better maintain communication efficiency and response speed, which is crucial for the charging process that requires real-time interaction.

The figure below shows a typical multi-point communication mode. EVSE is the master node, Node ID is equal to 0, and initiates communication. The vehicle EV is the responding node, Node ID is equal to 1. In addition, nodes such as connectors, inlets, or adapters can be added as needed. This flexible node configuration enables the system to adapt to different application scenarios and expansion requirements. If new functions or devices need to be connected in the future, the reserved Node IDs 5 to ID7 can also be used.

MCS supports single-pair Ethernet source in multi-drop communication mode
Single-pair Ethernet source supporting multi-branch communication mode

With a reliable physical layer, a powerful application layer protocol is also needed to support complex business logic. The ISO 15118 series of standards is currently recognized as the industry benchmark. Among them, ISO15118-20 is the latest version and the most advanced. It not only solves some limitations of earlier versions but also integrates more complete payment processing, fleet management, and V2G vehicle-network interaction functions. Considering the complexity of MCS and the extreme requirements for user experience and security, MCS may only support ISO15118-20 in the future and is not compatible with the old protocol. This ensures the highest level of interoperability and security.

MCS is a newly developed ultra-high-power charging interface and system, which will continue to develop as the technical details are continuously improved. With the continuous expansion of the global logistics industry and automated factories, MCS will also be more and more popular and applied.

Update cookies preferences
WhatsApp

Get a Quick Quote!

x

    Get a Quick Quote!

    x