Compared to gasoline vehicles, the biggest weakness of new energy vehicles is their charging efficiency (range replenishment per unit time), regardless of whether it’s ternary lithium (Kirin battery, Shenxing supercharging battery), lithium iron phosphate (BYD blade battery, Geely shield battery), sodium batteries, or future semi-solid and solid-state batteries. Currently, BYD’s fast-charging technology offers a clear, overall solution for charging efficiency (without increasing grid pressure). Even with subsequent battery technology iterations, the current fast charging power is sufficient.

BYD’s fast charging is basically 1000 volts and a 10C charging rate, while other companies are still using 800 volts. Jumping to 1000 volts would require a complete overhaul of production lines, supply chains, and technological routes.
BYD manufactures its own batteries; the electrolyte formula, separator material, and cell structure are all developed in-house. Other companies buy ready-made components from CATL. To customize according to BYD’s standards, CATL would have to open a separate production line—who could afford the cost?
Fast charging isn’t just about having a high-performance battery; it requires a complete overhaul from the battery cells to the entire vehicle’s electrical architecture. A 1000-volt voltage platform demands that all electrical components in the vehicle withstand it. The air conditioning compressor, DC-DC converter, and onboard charger all need upgrading—it’s not simply a matter of adding a fast charging port.
The power grid can’t handle it either. A single fast charging station can generate up to 1000 kilowatts, equivalent to the electricity consumption of a small factory. Building a charging station requires negotiating capacity increases with the grid and adding energy storage for buffering. The total investment is several times that of a regular supercharging station. While other companies were still vying for 800 volts, BYD had already mass-produced 1000 volts—a whole generation behind. Technological gaps aren’t easily closed; the R&D cycle is at least two to three years, and by the time you catch up, BYD has already iterated on its technology. This is very difficult to overcome.
Supply chain self-sufficiency is a significant hurdle. BYD manufactures all its own batteries, motors, electronic controls, and chips, relying on no external suppliers for 80% of its components. Other automakers spend a year just communicating requirements with suppliers and finalizing molds. BYD’s supply chain is unmatched.
Charging stations represent a huge hidden cost. BYD itself has to deploy its own fast-charging stations. If other companies adopt this technology standard, who will build the stations?

Furthermore, the fast-charging technology isn’t specifically labeled as BYD-specific; as long as your battery supports 1500W fast charging, it’s fine.
BYD’s fast-charging system also has reserved interfaces for third-party operators, such as TELD charging stations, which can add fast-charging station connections. Like the previous dual-gun fast charging, this technology is designed for charging station operators.
Moreover, fast-charging stations can seamlessly connect to directed-energy weapons, such as laser and microwave weapons used to defend against drones.
More accurately, it’s a point defense weapon currently used by the military and police, compatible with civilian charging station ports.
The biggest feature of a fast-charging station is its energy storage and megawatt-level output power; therefore, in wartime, each fast-charging station can function as a point defense weapon station. The Ministry of Industry and Information Technology also specifically praised the second-generation blade and fast charging technology.